These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction
These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction
These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction
These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction
These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction
These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction
These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction
These two 6-story, steel-frame office buildings, first leased by Apple Computer, rise above a ground floor-level plaza over a single-level, below-grade 400 car parking structure that extends well beyond the footprint of both towers.
Project completed by Doug Robertson with Rutherford & Chekene.
Innovations & Features
Parking structure was designed for 250 psf loading for easement that may require future 280 freeway exit.
Provided loading criteria and design concept for curtain wall and Glass Fiber Reinforced Concrete (GFRC) panel systems.
Central plaza designed for heavy planter and water feature loads.
Awards and Recognitions
Building of the Year - San Jose Metropolitan Chamber of Commerce and Association of South Bay Brokers
Architect | Hellar & Leaks Architects
Contractor | Barnes Construction